PnW-GrayWater
From Autosub Wiki
Large Dark tarp, existing 2x4s (get instructions from Pretzel) - 3 people, 1 hour
Recirculator - 2-3 people, 1 hour
Talk to David Levi about his idea about Pumpless sonic evaporator
Tear down sucks, do it on Sunday morning - 2 hours, 2 people (spread out over 4-5 hours)
Drain from sink, goes into small bucket, to pump, to gray water barrel
- suck out all gray water
- unroll tarp
- break down evap
- throw away tarp (on flatbed, to reno)
